  • Changes inside Turn 1 at IMS

    They had to reroute Dry Run Creek, interesting they installed a 1,144 ft Aliminum Box Culvert.

    http://www.contech-cpi.com/bridges/a...tter/Plate/751
    Tara was the name of our cat.

  • #2
    Originally posted by Tara
    interesting they installed a 1,144 ft Aliminum Box Culvert.
    Carbon fibre would have way too expensive